Member Company Profile

ATAC is a Yukon-based exploration company focused on developing Canada’s only Carlin-type gold district at the Rackla Gold Property. Recent work on the ~1,700 km2 property has resulted in a positive Preliminary Economic Assessment for the Tiger Gold Deposit, drilling of multiple high-grade Carlin-type gold zones and the identification of numerous early-stage gold exploration targets. ATAC and Barrick recently partnered to explore the Rackla Gold Property’s Orion Project, with Barrick having the option to earn up to 70% of Orion by spending $55 million in exploration. ATAC is well-financed with approximately $18 million in its treasury and is currently completing a $10 million exploration program at the Osiris and Rau Projects (which are not subject to Barrick’s earn-in right), while concurrently working with Barrick to advance the Orion Project.

IR Contact

Graham Downs
+1 (604) 687-2522
[email protected]
www.atacresources.com

Address

510 West Hastings Street, Suite 1016
Vancouver, BC V6B 1L8
Canada

Cautionary Information

© Copyright 2018, Denver Gold Group & ATAC Resources Ltd..
Although every care has been taken to ensure that this data is accurate, Denver Gold Group cannot accept responsibility for sourcing variances, mistakes, errors or omissions or for any action taken in reliance thereon. Use of this data is governed by Denver Gold Group's Terms of Use.

Cautionary Statement Regarding Forward Looking Statements, Including Outlook

FORWARD-LOOKING STATEMENTS
The corporate materials presented at the 2018 Denver Gold Forum contain forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of inferred and indicated mineral resources; (ii) the success of exploration activities; (iii) the results of the PEA including statements about future production, future operating and capital costs, the projected IRR, NPV, payback period, and production timelines for the Tiger Deposit.

These statements are based on information currently available to ATAC Resources Ltd. (“ATAC”) and ATAC provides no assurance that actual results will meet management's expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or "would". Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral resources, the realization of resource estimate, gold metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Tiger Deposit in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the completion of the environmental assessment process, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While ATAC considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ATAC to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not commence at the Tiger Deposit, risks relating to variations in mineral resources, grade or recovery rates resulting from current exploration and development activities, risks relating to changes in gold prices and the worldwide demand for and supply of gold, risks related to increased competition in the mining industry generally, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Tiger Deposit may not be available on satisfactory terms, or at all, risks related to disputes concerning property titles and interest, and environmental risks. This list is not exhaustive of the factors that may affect any of ATAC's forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on ATAC's forward-looking information. ATAC does not undertake to update any forward-looking information that may be made from time to time by ATAC or on its behalf, except in accordance with applicable securities laws.
PEA DISCLOSURE
It should be noted that the Tiger Deposit PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA forecast will be realized or that any of the resources will ever be upgraded to reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional information about the Tiger Deposit PEA is summarized in ATAC’s May 31, 2016 technical report titled “Technical Report and Preliminary Economic Assessment for the Tiger Deposit, Rackla Gold Project, Yukon, Canada” which can be viewed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com.
QUALIFIED PERSON
Julia Lane, B.Sc., P.Geo., the Vice President of Exploration of ATAC, is a qualified person for the purposes of National Instrument 43-101. All technical information contained in this presentation has been approved by Julia Lane.
TRUE WIDTHS
True widths for all Conrad, Osiris, Sunrise, Ibis, Anubis, Tiger and Ocelot highlight diamond drill holes are estimated to be 30% - 70% of intersected widths.
RAB drill hole intersections are drilled thicknesses and true widths are unknown. Orion and Tiger East Anomaly diamond drilling true thicknesses are also unknown at this time.

ATAC Resources Ltd.

Toronto Venture Exchange : ATC

Last Updated: January 10, 2018

Status: Explorer
Primary Mineral: Gold
Primary Country of Operation: Canada
Value Drivers
  • The Rackla Gold Property is over 1,700 sq/km and is divided into three separate projects: Rau (100% ATAC), Orion (Barrick earn-in) and Osiris (100% ATAC and hosts Canada's first Carlin-type gold)
  • April 2017: Barrick enters earn-in agreement with ATAC whereby Barrick can earn up to 70% of the Orion Project by spending $55 million in exploration.
  • ATAC is completing a $10 million exploration program on the Osiris and Rau Projects in 2017. Initial drilling from the Conrad Carlin-type gold zone returns 12.50 m of 20.78 g/t gold in hole OS-17-238.
Top Shareholders
  • Barrick Gold Corporation
  • Tocqueville
  • Strategic Metals Ltd.
Management
Chairman: Doug Goss
President & CEO: Graham Downs
CFO: Larry Donaldson
COO: Ian Talbot
Other Key Staff: Julia Lane - VP, Exploration
Rob Carne - Chairman of the Technical Committee and Director
Don Poirier - Director
Bruce Youngman - Director
Ed Cope - Technical Advisor
Capital Structure
Common Shares Outstanding: 139,581,877
Float (%): 99.00
Options Outstanding: 11,450,000
Fully Diluted Shares: 151,031,877
Stock as of Feb 18, 2018 8:57 PM MST | Exchange: Toronto Venture Exchange
Last Trade: Feb 16, 2018 8:47 PM MST Local: CAD Ch. Since Last
Last Price 0.50 0.00, 0.00% 0.40
Volume 41.30 K
Avg. Vol. 164.44 K
Bid 0.50 0.50 0.40
Mid 0.51 0.51 0.41
Ask 0.52 0.52 0.41
Open 0.50 0.50 0.39
High 0.53 0.53 0.42
Low 0.50 0.50 0.39
Close 0.50 0.50 0.40
52-Wk High 0.89 0.89 0.71
52-Wk Low 0.38 0.38 0.30
1-Wk High 0.53 0.53 0.42
1-Wk Low 0.49 0.49 0.39
Dividend 0.00 0.00
EPS -0.02 -0.01
Market Cap 69.82 M 69.82 M 55.63 M
Price 1 Wk Ago 0.50 0.50 0.40
Price 1 Mnth Ago 0.56 0.56 0.45
Price 3 Mnth Ago 0.48 0.48 0.38
Price 6 Mnth Ago 0.62 0.62 0.49
Price 1 Yr Ago 0.47 0.47 0.37

IR Contact

Graham Downs
+1 (604) 687-2522
[email protected]
www.atacresources.com

Address

510 West Hastings Street, Suite 1016
Vancouver, BC V6B 1L8
Canada

Cautionary Information

© Copyright 2018, Denver Gold Group & ATAC Resources Ltd..
Although every care has been taken to ensure that this data is accurate, Denver Gold Group cannot accept responsibility for sourcing variances, mistakes, errors or omissions or for any action taken in reliance thereon. Use of this data is governed by Denver Gold Group's Terms of Use.

Cautionary Statement Regarding Forward Looking Statements, Including Outlook

FORWARD-LOOKING STATEMENTS
The corporate materials presented at the 2018 Denver Gold Forum contain forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of inferred and indicated mineral resources; (ii) the success of exploration activities; (iii) the results of the PEA including statements about future production, future operating and capital costs, the projected IRR, NPV, payback period, and production timelines for the Tiger Deposit.

These statements are based on information currently available to ATAC Resources Ltd. (“ATAC”) and ATAC provides no assurance that actual results will meet management's expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or "would". Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral resources, the realization of resource estimate, gold metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Tiger Deposit in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the completion of the environmental assessment process, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While ATAC considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ATAC to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not commence at the Tiger Deposit, risks relating to variations in mineral resources, grade or recovery rates resulting from current exploration and development activities, risks relating to changes in gold prices and the worldwide demand for and supply of gold, risks related to increased competition in the mining industry generally, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Tiger Deposit may not be available on satisfactory terms, or at all, risks related to disputes concerning property titles and interest, and environmental risks. This list is not exhaustive of the factors that may affect any of ATAC's forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on ATAC's forward-looking information. ATAC does not undertake to update any forward-looking information that may be made from time to time by ATAC or on its behalf, except in accordance with applicable securities laws.
PEA DISCLOSURE
It should be noted that the Tiger Deposit PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA forecast will be realized or that any of the resources will ever be upgraded to reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional information about the Tiger Deposit PEA is summarized in ATAC’s May 31, 2016 technical report titled “Technical Report and Preliminary Economic Assessment for the Tiger Deposit, Rackla Gold Project, Yukon, Canada” which can be viewed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com.
QUALIFIED PERSON
Julia Lane, B.Sc., P.Geo., the Vice President of Exploration of ATAC, is a qualified person for the purposes of National Instrument 43-101. All technical information contained in this presentation has been approved by Julia Lane.
TRUE WIDTHS
True widths for all Conrad, Osiris, Sunrise, Ibis, Anubis, Tiger and Ocelot highlight diamond drill holes are estimated to be 30% - 70% of intersected widths.
RAB drill hole intersections are drilled thicknesses and true widths are unknown. Orion and Tiger East Anomaly diamond drilling true thicknesses are also unknown at this time.